Time of execution:

2005
 

Client:

AZV Erdinger Moos
Am Kanal 1
85462 Eittling
 

Conveying system:

All together 7 pumps with respectively 35kW electronical power
 

Building activity:

Complete redevelopment of the existing construction, as well as newbuilding of an
emergency pumping station, which were to assure the operation while the redevelopment.
The complete controlling plant (16 fields) has been renewed by us.
 

Our field of activity:

Extension of all 16 existing switch gear fields, as well as the existing installation in the
basement of the pumping station. Afterwards, after the constructural redevelopment
the installation in the basement as well as the new switch gear fields, has been imple-
mented. A part of the existing installaton has been taken over and integrated in the
new switchgear. While the reconstruction the operation has permanently been safe-
guarded. Therefor an emergency power generator has been used in order to realize
an enclosing of the input.
The switchgear contains the following main-components

  • Input net, emergency power
  • PLC with visualization
  • Remote control
  • process measuring and control technology
  • uninterrupted power supply unit
  • general installation
  • 7 x frequency converter pumpe